Loading…
Kwangmyung Electric signed a contract with Korea Hydro & Nuclear Power to supply 480V motor control panels for Shin-Hanul Units 3 and 4. The contract is worth 570 billion won, with a term from March 18, 2025 to April 30, 2029.
“광명전기는 한국수력원자력과 '신한울 3·4호기 480V 전동기 제어반(E209) 구매' 계약을 체결했다고 19일 공시했다.”bloter.net
Summarized from public sources; check the original articles before acting on it.