Loading…
SP Group won a bid to operate and maintain the district cooling and heating system at Future Medical City in Chengdu, China, under a 10-year energy service contract worth 90 million yuan ($16.7 million). The system will be operational by the end of December 2024.
“The system, which has an installed cooling capacity of 4,800 refrigeration tonnes (RT), will supply chilled and hot water for cooling and heating respectively, as well as steam for sterilization and humidity control.”chinadaily.com.cn
Summarized from public sources; check the original articles before acting on it.