Loading…
CRRC's medium- and low-voltage power device industrialization project in Yixing, Jiangsu, with a phase 1 investment of 5.9 billion yuan, has been completed and put into operation. The plant can produce 360,000 8-inch medium- and low-voltage component substrates per year.
“一期投资59亿元的中车中低压功率器件产业化(宜兴)建设项目,历时18个月正式竣工投产。”wuxi.gov.cn
Summarized from public sources; check the original articles before acting on it.