Loading…

Stiga RM is constructing a new 15,000-square-metre wood wool cement board factory in Tukums, Latvia, with equipment supplied by SCM Group. The plant is expected to start production by the end of 2025, creating nearly 100 jobs and producing up to 4.5 million square metres of board annually.
“The new plant is expected to be the most advanced wood-wool cement board (WWCB) plant in the world, with a level of technology solutions and robotics that is currently unmatched anywhere else.”stigarm.lv
Summarized from public sources; check the original articles before acting on it.