Loading…

ABB secured a contract from NKT to supply an integrated power and propulsion system for the new cable-laying vessel NKT Eleonora. The system includes Onboard DC Grid, Azipod propulsion, and PEMS, with the vessel scheduled to enter operations in 2027.
“We are delighted to be working with ABB again following our successful collaboration on NKT Victoria”new.abb.com
Summarized from public sources; check the original articles before acting on it.