Loading…
Boseong Powertech has signed a KRW 8.5 billion contract with Korea Electric Power Technology (KEPCO E&C) to supply approximately 3,628 tons of steel frames for the ARA small research reactor in Gyeongju, South Korea. Delivery is due by October 2027.
“수주액은 약 85억원(공급가액) 규모로 2027년 10월 납기다.”sankyung.kr
Summarized from public sources; check the original articles before acting on it.