Loading…

Doosan Enerbility secured a 665.8 billion won ($480 million) turnkey EPC contract from Korea Southern Power for a new LNG combined cycle power plant at the Hadong generation site in South Gyeongsang Province. The contract was disclosed in a September 1 regulatory filing.
“Doosan Enerbility has secured a major role in South Korea’s power transition through a 665.8 billion won, or approximately $480 million, turnkey engineering, procurement and construction contract.”turbomachinerynews.com
Summarized from public sources; check the original articles before acting on it.