Loading…
Adven and Suominen have agreed on an investment in a 12 MW electric steam boiler at Suominen's nonwoven plant in Nakkila, Finland, to be operational by fall 2025. The boiler will optimize energy production based on electricity spot prices.
“Starting in the fall of 2025, Adven will supply the steam energy required by the plant using two boilers.”adven.com
Summarized from public sources; check the original articles before acting on it.