Loading…

Doosan Enerbility signed a 260 billion won ($188 million) contract with Korea South-East Power to supply gas turbines and other equipment for the Bundang Combined Cycle Power Plant modernization by March 2028.
“Doosan Enerbility plans to supply a 380-megawatt Class H large gas turbine, steam turbine, heat supply equipment, and other equipment for Block 1 of the Bundang plant by March 2028.”pulse.mk.co.kr
Summarized from public sources; check the original articles before acting on it.