Loading…

GE Vernova received an order from LG&E and KU for 7HA.03 combined-cycle plant equipment to power a new 645MW natural gas generating unit at the Mill Creek Generating Station in Louisville, Kentucky. The unit will feature GE's 7HA.03 gas turbine with hydrogen capability.
“The performance of the new 7HA.03 gas turbine includes a ramp rate of 75MW/min as validated at GE Vernova’s Test Stand 7 in Greenville, South Carolina.”powerengineeringint.com
Summarized from public sources; check the original articles before acting on it.