Loading…

Mitsubishi Power received an order from HK Electric for natural-gas-fired GTCC power generation system equipment for Lamma Power Station's Unit 13 in Hong Kong. The unit has an output of 380 MW and is scheduled to begin operation in early 2029.
“Unit 13 operations scheduled to commence in early 2029.”power.mhi.com
Summarized from public sources; check the original articles before acting on it.