Loading…
Gasco Engineering executed a design, supply, installation and commissioning contract worth USD 4 million for a 120 MMscfd gas pressure boosting compressor station on the Mari Gas Pipeline at Daharki for client CPGCL.
“Design, Supply, Installation, Testing, and Commissioning of complete facility of Gas Pressure Boosting Compressor station on Mari Gas Pipeline”gascoengineering.com.pk
Summarized from public sources; check the original articles before acting on it.