Loading…

ABB won an order from Portsmouth International Port to supply a shore connection solution for ferries and cruise ships as part of the Sea Change project. The order was signed in January 2024, with installation due in Q4 2024 and operational by Q2 2025.
“ABB's shore connection allows vessels to turn off their engines while at berth, avoiding annual carbon dioxide emissions for the vessels calling at the Portsmouth International Port by an estimated 20,000 metric tons from 2027.”forwardermagazine.com
Summarized from public sources; check the original articles before acting on it.