Loading…
GCC has commissioned thyssenkrupp Polysius North America to build a 3,000-mtpd clinker production line (expandable to 3,500 mtpd) at its Odessa, Texas plant. Start-up is anticipated as early as Q4 2025.
“The new plant in Odessa, Texas, is on a challenging fast-track schedule, with start-up anticipated as early as fourth quarter 2025.”cementoptimized.com
Summarized from public sources; check the original articles before acting on it.