Loading…

Unioninvest d.d. signed a contract on July 16, 2019 with the Municipality of Prozor Rama, Bosnia and Herzegovina, for the design and construction of a wastewater treatment plant with a capacity of PE 3,000+3,000. The contract price is 3,547,725.99 KM (€1,813,923.50).
“Signing of the contract, date: 16.07.2019.”unioninvest.net
Summarized from public sources; check the original articles before acting on it.