Loading…

Union Tool will construct a third factory building at its Mitsuke plant site in Niigata Prefecture, Japan, to strengthen production of carbide end mills. The 2-story reinforced concrete building will have 6,599 square meters of floor space, with construction from June 2023 to May 2024 at a cost of 2.6 billion yen.
“今回の第三工場建設により、既存品の量産拡大に加え、Valueシリーズをはじめとする新製品の投入加速とユーザー向け特殊品の対応力の強化を図る。”automation-news.jp
Summarized from public sources; check the original articles before acting on it.