Loading…
Capstone Green Energy Corporation announced that its distributor Supernova Energy Services SAS secured an order for a C1000S microturbine to be installed at an industrial dairy plant in Colombia, expected to be commissioned in October 2023.
“The system will be operated at an industrial dairy alongside an Alfa Laval steam boiler evaporator, producing 6,200 lbs. of steam per hour.”capstonegreenenergy.com
Summarized from public sources; check the original articles before acting on it.