Loading…
Korea Midland Power (KOMIPO) is expected to sign a contract with Doosan Enerbility next month to supply a 380MW gas turbine (DGT6-300H S2+) for the new Boryeong combined cycle power plant, replacing Boryeong Coal-Fired Unit 5. This will be the first domestic large gas turbine application.
“두산 측과 최종 협상을 진행 중이며 380MW급 대형 가스터빈의 첫 국내 도입 사례가 될 것으로 기대한다.”electimes.com
Summarized from public sources; check the original articles before acting on it.