Loading…
NKT has been awarded a multi-year framework agreement by TenneT to supply HVDC power cable systems for offshore wind farms Nederwiek 3 and Doordewind 1 & 2, with a combined capacity of 6 GW. The contracts are valued at approximately €1.5 billion and are expected to be called off in 2025.
“The framework agreement stipulates that NKT is to supply several high-voltage direct current (HVDC) on- and offshore power cable systems.”energywatch.com
Summarized from public sources; check the original articles before acting on it.