Loading…

Climeon has signed a €1.1 million contract with UAB Termolink to supply two HeatPower 300 waste heat recovery modules for NEO GROUP's PET resins production facility in Klaipeda, Lithuania. Delivery and installation are scheduled for the first half of 2024.
“Climeon has signed a 1.1 MEUR contract with UAB Termolink in Lithuania for the sale of Climeon’s HeatPower 300 waste heat recovery system, which will provide on-site clean electricity at NEO GROUP’s PET resins production facility.”climeon.com
Summarized from public sources; check the original articles before acting on it.