Loading…

Pellenc ST is constructing a new production center of over 2,000 m² at its Pertuis headquarters in France to double its production capacity for smart sorting equipment. The expansion is part of a €30 million investment program (2018-2025) and follows a 50% growth in 2022.
“Ces nouvelles surfaces de production de plus de 2 000 m² nous permettent donc de doubler notre capacité de production et de répondre à des commandes à l'échelle industrielle.”pellencst.com
Summarized from public sources; check the original articles before acting on it.