Loading…
Nabtesco has decided on the basic schedule for a new precision reducer factory on land acquired in 2020 in Hamamatsu, Japan, with construction starting in autumn 2022 and the building finished by September 2023. Total investment through 2026 is about JPY 47 billion, and annual capacity is planned to reach 2 million units by 2026.
“2026年時点では精密減速機の定時生産能力を現在の約2倍の年産200万台に拡大する計画。”n-seikei.jp
Summarized from public sources; check the original articles before acting on it.