Loading…
Mitsubishi Heavy Industries and Mitsubishi Heavy Industries Engineering were awarded a Front End Engineering Design (FEED) contract for a gas turbine combined cycle power plant and CO2 capture plant at Peterhead Power Station in Aberdeenshire, Scotland. The project is being developed by SSE Thermal and Equinor.
“MHI and MHIENG Awarded FEED Contract Relating to a GTCC Power Plant and CO₂ Capture Plant for a Power Station in Scotland”mhi.com
Summarized from public sources; check the original articles before acting on it.