Loading…

SMST has signed a contract with Tersan Shipyard to supply mission equipment, including a 6t 3D motion compensated crane and a motion compensated gangway, for two newbuild Construction Service Operation Vessels (CSOVs) for Acta Marine. Delivery is planned for Q3 2023.
“We are very pleased to be part of the two next generation Methanol MDO/HVO powered CSOVs for Acta that will be built at Tersan Shipyard.”tgs4c.com
Summarized from public sources; check the original articles before acting on it.