Loading…
ORE Catapult directly awarded a contract to Konecranes Demag UK Limited for modifications and upgrades to existing overhead crane systems in the Fujin Test Hall as part of the Blyth Development Project. The contract is valued at £489,894 and was awarded on 4 November 2026.
“ORE Catapult has directly awarded a contract for modifications and upgrades to the existing overhead crane systems within the Fujin Test Hall as part of the Blyth Development Project.”justskim.ai
Summarized from public sources; check the original articles before acting on it.