Loading…

Siemens Gamesa is spending £186 million to add a new manufacturing hall and extend the existing hall at its Hull, UK, blade facility, adding over 41,000 sq m to enable production of 108m blades from 2023.
“Siemens Gamesa is spending £186 million on a new manufacturing hall at the site and extending the existing hall, adding more than 41,000 sq m floor space.”maritimeprofessional.com
Summarized from public sources; check the original articles before acting on it.