Loading…
Jinzhou Thinkon Semiconductor has started construction of a new semiconductor-grade silicon product manufacturing facility in Taihe District, Jinzhou, Liaoning. The project has a total investment of CNY 700 million, with CNY 200 million planned for 2022, and will produce large-diameter 8-inch and 12-inch IC crystals with annual capacity of 3.6 million wafers.
“该项目计划总投资7亿元,分三期建设,预计2022年当年投入资金2亿元。”casmita.com
Summarized from public sources; check the original articles before acting on it.