Loading…
Geumhwa PSC has signed a contract with Korea South-East Power for routine maintenance of boiler facilities at Gangneung Anin Thermal Power Plant Units 1 and 2. The contract is worth KRW 26,912,630,000 and runs from May 16, 2022 to May 15, 2028.
“금화피에스시는 한국남동발전과 강릉안인화력 #1,2 보일러설비 경상정비공사 계약을 체결했다고 25일 공시했다.”biz.heraldcorp.com
Summarized from public sources; check the original articles before acting on it.