Loading…
CFT Group has been contracted by Refresco to design and install a syrup room with a 42,000 l/h capacity for soft drinks production at a facility in the north of England.
“The latest collaboration took us to the North of England, where we worked on a new objective: the design and installation of a syrup room for the production of soft drinks.”cft-group.com
Summarized from public sources; check the original articles before acting on it.