Loading…

Veer Steel Mills started construction of a melt shop at its Alrode plant in Alberton, South Africa, as part of a second expansion phase. The project includes two furnaces and a billet strand caster, with total capacity projected at 250,000 t/y and capital cost of R500 million.
“Secondary steel manufacturer Veer Steel Mills has entered its second phase of expansion with the construction of a melt shop–the newest addition to its plant in Alrode, Alberton.”engineeringnews.co.za
Summarized from public sources; check the original articles before acting on it.