Loading…

GKN Aerospace signed a follow-on contract with Lockheed Martin to supply launch tubes for the PAC-3 Missile Segment Enhancement through 2025, and an additional development contract for mid-section and seeker housing, with production beginning in 2024.
“GKN Aerospace has signed a follow-on contract with Lockheed Martin to supply launch tubes for the PAC-3 Missile Segment Enhancement through 2025.”aerobd.news
Summarized from public sources; check the original articles before acting on it.