Loading…
CITIC Construction won the bid for the first and second phases of the Al Khairat heavy oil power plant in Karbala Province, Iraq, on September 29, 2021. The estimated contract value for each phase is about $2.85 billion.
“CITIC Construction won the bid for the first and second phases of AI Khairat heavy oil power plant in Iraq on September 29, 2021.”construction.citic
Summarized from public sources; check the original articles before acting on it.