Loading…

KMC EOOD and Hitachi ABB Power Grids signed a contract with Kozloduy NPP EAD to replace medium-voltage sections at the Bulgarian nuclear plant. The contract is valued at BGN 8,334,462 (excluding VAT) with a 40-month execution period.
“On this date, October 1st, 2021, in the presence of Mr. Teodor Osikovski – Manager of KMC EOOD, Mr. Pavel Lojsčík – Managing Director of the cluster – Czech Republic, Slovakia, Bulgaria, Hungary, Romania, Russia and Ukraine of Hitachi ABB Power Grids and Mr. Stefan Minchev – Executive Director of Hi”kmc-bg.com
Summarized from public sources; check the original articles before acting on it.