Loading…

Ciner Group, through its subsidiary Park Cam, is building a third furnace at its glasshouse in Bozüyük, Bilecik, with an investment of 1.2 billion Turkish Liras. The expansion will add capacity for 2.8 billion glass bottles annually and create 100 jobs, with operations expected to start before the second half of 2022.
“We have two furnaces in Bozüyük for glass packaging, and now we are building the third one.”cinergroup.com.tr
Summarized from public sources; check the original articles before acting on it.