Loading…

NNPC signed a contract with China Machinery Engineering Company (CMEC) and General Electric (GE) to provide 50 MW of electricity to Maiduguri, Borno State. CMEC will execute EPC and GE is the equipment manufacturer. The single cycle is expected by December 2021 and combined cycle by Q1 2022.
“The Nigerian National Petroleum Corporation (NNPC) has signed a contract with China Machinery Engineering Company (CMEC) and General Electric, (GE) to provide 50 Mega Watts of electricity to Maiduguri, Borno State.”businessday.ng
Summarized from public sources; check the original articles before acting on it.