Loading…
BHI (BHI Co., Ltd.) disclosed a contract with Hanwha Engineering & Construction to supply LNG combined-cycle power generation equipment worth 17.12 billion won. The contract was signed on August 2, 2021, with a term until February 23, 2023.
“비에이치아이는 한화건설과 LNG복합화력 발전설비 공급계약을 체결했다고 3일 공시했다.”biz.heraldcorp.com
Summarized from public sources; check the original articles before acting on it.