Loading…

SA Water completed a $52 million upgrade of the Murray Bridge Wastewater Treatment Plant, including a new plant in Brinkley, increasing capacity from 2.6 to 4.5 million litres per day. The plant became fully operational in mid-2020.
“It’s vital our wastewater infrastructure is able to operate with minimal environment”utilitymagazine.com.au
Summarized from public sources; check the original articles before acting on it.