Loading…
Prysmian Group will supply more than 2,000 km of medium voltage, low voltage, instrumentation and control cables to NNB Generation Company (EDF Energy) for the Hinkley Point C nuclear power plant. The contract is worth over €20 million. Cables will be manufactured in Paron, France, with deliveries starting in Q4 2021.
“We are very proud to take part in the increasingly strategic transformation of the power industry.”neimagazine.com
Summarized from public sources; check the original articles before acting on it.