Loading…

Hitachi ABB Power Grids has won a contract from Dogger Bank Wind Farm to connect the third transmission link (C1) of the world's largest offshore wind farm, with 3.6 GW capacity, to the UK mainland using HVDC Light technology. The contract is subject to financial close of the third phase, forecast for late 2021.
“Hitachi ABB Power Grids has today announced that it has won another major order from Dogger Bank Wind Farm to connect the third transmission link from the world’s largest offshore wind farm over 130 km to the UK mainland.”hitachienergy.com
Summarized from public sources; check the original articles before acting on it.