Loading…

The M2B chip building of Hunan Sanan Semiconductor project in Changsha High-tech Zone topped out, marking a major breakthrough for the first third-generation semiconductor industrial park in Hunan province. The total investment is 16 billion yuan, with full production expected by mid-2021.
“国内第一条碳化硅研发、生产全产业链生产线正在长沙崛起。”hunantoday.cn
Summarized from public sources; check the original articles before acting on it.