Loading…

Capital Power has ordered two Mitsubishi Power M501JAC gas turbines to repower its Genesee units 1 and 2 in Alberta, converting from coal to natural gas. The repowered plant will provide 1,360 MW of capacity, with Unit 1 completion in 2023 and Unit 2 in 2024.
“Capital Power is following a strategy toward a low-carbon future with a target to be net carbon neutral before 2050.”power-eng.com
Summarized from public sources; check the original articles before acting on it.