Loading…
Tosyali Demir Celik placed an order with Primetals Technologies to supply an EAF Quantum electric arc furnace, a twin vacuum-degassing plant, and a two-strand slab caster for a flat steel greenfield project in Iskenderun, Turkey. The new meltshop is scheduled to be commissioned by the end of 2022.
“The new meltshop is scheduled to be commissioned in by the end of 2022.”steel-technology.com
Summarized from public sources; check the original articles before acting on it.