Loading…
Metafrax Group began construction of a third formalin plant at its Moscow-area site, with a project cost of about 1.7 billion rubles, scheduled to finish within 2.5 years.
“The Company began construction of the third formalin plant at the Moscow – area site.”metadynea.ru
Summarized from public sources; check the original articles before acting on it.