Loading…
Chengdu Xiling Power Technology plans to invest 142.63 million yuan in a second-phase technical upgrade of its aerospace parts (large ring) production line in Qingyang District, Chengdu, adding capacity for 15,000 aerospace structural parts, 800,000 sheet metal parts and 600 shaft parts annually.
“项目达成后形成年产航空结构件1.5万只、航空钣金件80万只、轴类件600件的年生产能力。”epaper.cs.com.cn
Summarized from public sources; check the original articles before acting on it.