Loading…

Taihan Electric Wire signed a contract with National Grid Electricity Transmission PLC to supply and joint cables for the London Power Tunnels Package 3 project in London, UK. The contract is valued at 924.9 billion won and runs from July 23, 2020 to July 15, 2027.
“대한전선(001440)은 기타 판매공급계약에 관한 단일판매ㆍ공급계약체결을 24일에 공시했다.”etnews.com
Summarized from public sources; check the original articles before acting on it.