Loading…

Bairds Malt constructed a new malting plant at its Inverness facility on Longman Road, increasing capacity by 57,000 metric tonnes per annum. The plant became operational in 2023.
“Work is now complete at our Arbroath facility, with the refurbishment of the Clova malting plant, increasing production capacity by 22,000 metric tonnes (mt) per annum.”bairds-malt.co.uk
Summarized from public sources; check the original articles before acting on it.