Loading…

PJSC Energomashspetsstal accepted a core shell of the reactor vessel for unit 7 of Tianwan NPP in China, under a contract signed in July 2019.
“Comments from the panel of inspectors no. The sides signed a Protocol on compliance of all monitored parameters to the requirements of the contract.”metallurgprom.org
Summarized from public sources; check the original articles before acting on it.