Loading…
Beijing OriginWater Technology Co., Ltd. won a 30.5139 million yuan ($4.3 million) contract to replace membrane modules for the second phase of the Taozivan wastewater treatment plant in Yantai, Shandong.
“烟台市套子湾污水处理有限公司套子湾二期工程膜组器更换中标公告”bid.10huan.com
Summarized from public sources; check the original articles before acting on it.