Loading…

GE announced an order to supply two 9HA.01 gas turbines, steam turbines, generators and HRSGs for a 1.4 GW combined cycle power plant at PGE's Dolna Odra site in Poland, with commissioning expected in 2023.
“GE today announced the order of two high-efficiency and lower emission power units to be constructed through consortium at the Polska Grupa Energetyczna Górnictwo i Energetyka Konwencjonalna’s (PGE) Dolna Odra Power Plant.”ge.com
Summarized from public sources; check the original articles before acting on it.