Loading…

Iren S.p.A., through its subsidiary Iren Energia, signed a €180 million EPC contract with Ansaldo Energia for a new 430 MW gas combined cycle at the Turbigo power station in Italy, increasing capacity from 850 MW to 1,280 MW.
“Iren S.p.A., through its subsidiary Iren Energia S.p.A., signed a contract with Ansaldo Energia for the new combined gas cycle realization, with an investment of approximately €180 million.”ansaldoenergia.com
Summarized from public sources; check the original articles before acting on it.